Floorplans

“…With its strategic location, RLP allows us to provide high-quality logistics and warehousing services to our clients…”

A
B
C
D
connection to A15 & N57
A15 & N57
N494

Add Your Tooltip Text Here

Under construction

Building A

The representative office spaces are modular and can therefor easily be extended to the mezzanines from where here is a connection with the activities in the warehouse. There is plenty of room for natural daylight to enter the whole building. Office spaces are open and freely configurable, adaptable to any use.

20,946

Warehouse

2,240

Mezzanine

906

Offices

132

Parking spots

warehouse

Maximum storage hight:12.2 m
Column grid:12 x 22.8 m
Floor:Flat concrete floor according to NEN 2747 2001, table 1, class 4
Floor load:Warehouse 50 kN/m², point load 90 kN, shipping zone 25 kN/m²
Loading docks:22 loading docs 3 x 3 m door with hydraulic leveller, approx. 1 unit per 950 m² warehouse
Overhead door:4 x 4.5 m with ramp
Lighting:LED fixtures (200 Lux)
Heating:Floor heating (min. room temperature 15°C )
Sprinklers:Storage sprinkler system K25
Lift:Possible as tenant option (to mezzanine)
Finishing sanitary areas:Anthracite floor tiles, white wall tiles

Mezzanine

Ceiling height:approx. 4.2 m
Column grid:Columns integrated into walls
Floor:Compression layer
Floor load:7.5 kN/m²
Lighting:LED fixtures (200 Lux)
Sprinklers:Storage sprinkler system K25

Office

Ceiling height:2.8 m
Column grid:6 x 8 m
Floor load:4.0 kN/m²
Cooling and Heating:VRF Units
Sprinkler:Non-storage sprinkler system HC classification
Floor finishing:Anhydrite screed
Wall finishing:Painted scan wallpaper
Ceiling finishing:System ceiling with LED luminaires (500 Lux) fixes
Facilities:Data and such is a tenant facility, according to the TD
Finishing sanitary areas:Anthracite floor tiles, white wall tiles
Pantry: Pantry with refrigerator, dishwasher, microwave and connections for coffee machine
Outdoor area:Bicycle shed with connections for electric bicycles

Car park incl. 7 double charging stations

Truckcourt uitgevoerd in beton

Fencing with electric sliding gate around the truck court

Under construction

Building D1

As in RLP A, the representative office spaces of building D1 are modular, allowing them to be easily extended to the mezzanines. From there, there is a connection to the activities in the warehouse. There is plenty of space for natural daylight throughout the building. Office spaces are open and freely configurable and adaptable to each use.

16,255

Warehouse

1,945

Mezzanine

957

Offices

93

Parking spots

Under construction

Building D2

Warehouse D2 meets the same high standards as D1. It can be leased either independently or in combination with D1, giving a total warehouse area of 23,972 m². The unit then contains 3 offices with a total area of 1,227 m².

7,720

Warehouse

701

Mezzanine

270

Offices

49

Parking spots

warehouse

Maximum storage hight:12.2 m
Column grid RLP D1:12 x 22.8 m
Column grid RLP D2:11,4 x 22,8 m
Floor:Flat concrete floor according to NEN 2747 2001, table 1, class 4
Floor load:Warehouse 50 kN/m², point load 90 kN, shipping zone 25 kN/m²
Loading docks RLP D1:20 loading docks 3 x 3 m door and hydraulic leveller, approx. 1 unit per 808 m² warehouse
Loading docks RLP D2:8 loading docks 3 x 3 m door and hydraulic leveller, approx. 1 unit per 950 m² warehouse
Overhead door:4 x 4.5 m with ramp
Lighting:LED fixtures (200 Lux)
Heating:Floor heating (min. room temperature 15°C )
Sprinklers:Storage sprinkler system K25
Finishing sanitary areas:Anthracite floor tiles, white wall tiles

Mezzanine

Ceiling height:approx. 3.8 m
Column grid:Columns integrated into walls
Floor:Compression layer
Floor load:7.5 kN/m²
Lighting:LED fixtures (200 Lux)
Sprinklers:Storage sprinkler system K25

Office

Ceiling height:3.1 m
Column grid:Columns integrated into walls
Floor load:4.0 kN/m²
Cooling and Heating:VRF Units
Sprinkler:Non-storage sprinkler system HC classification
Lift RLP D1:Passenger lift 1,150 kg, 15 persons
Lift RLP D2:Possible as tenant option
Floor finishing:Anhydrite screed
Wall finishing:Painted scan wallpaper
Ceiling finishing:System ceiling with LED luminaires (500 Lux) fixes
Facilities:Data and such is a tenant facility, according to the TD
Finishing sanitary areas:Anthracite floor tiles, white wall tiles
Pantry: Pantry with refrigerator, dishwasher, microwave and connections for coffee machine
Outdoor area:Bicycle shed with connections for electric bicycles

Parking incl. 10 double charging stations

Truckcourt uitgevoerd in beton

Fencing with electric sliding gate around the truck court

Optional addition of 70 parking spaces

“Rotterdam Logistics Park is located just south of Rotterdam with direct connections to the rest of Europe. With its strategic location, RLP allows us to provide high-quality logistics and warehousing services to our clients with an emphasis on flexibility. At TGI, we also use the great logistics infrastructure and advanced supply-chain of the Netherlands to efficiently connect our customers in Asia and Europe.”

- Jack Lin, managing director at Top Group International, tenant RLP C;

RLP B and C delivered

RLP covers a total of four warehouses with an area of about.100,000 sqm. Halls B and C were completed and immediately leased by the end of 2023. Warehouses A and D are under construction and will be completed in late 2025 and early 2026, respectively.

Flexible to configure

The design at Rotterdam Logistics Park is characterised by flexibility. The layout of warehouses RLP A and D can be adapted based on your wishes and requirements.Units are already available from 8,000 m² to 28,000 m².

Curious about the possibilities? Contact us.



This website has been compiled with the utmost care. No rights may be derived from the floor plans, dimensions and specifications shown.

Contact us